Nepal's most detailed preliminary construction cost estimator. Get a realistic picture before you commit your life savings to a contractor.
The Engineering Engine
We don't use guesswork. ZILA runs your inputs through a structural algorithm built on real Nepalese market data and national building codes — so you walk into every contractor meeting already knowing the real numbers.
Cement in Humla costs more than in Chitwan. ZILA maps freight, labor, and material rates across 50 districts using a live 2082/83 B.S. pricing matrix.
The engine dynamically calculates rebar tonnage, concrete volume, and labor distribution strictly adhering to NBC 105:2020 (AMD 2025) seismic safety guidelines.
Results are formatted into a detailed, phase-wise Preliminary Bill of Quantities — so you know exactly what materials you need and what each stage costs before meeting a single contractor.